WHS docs for electricians.
Sorted by Monday.
Fixed-price WHS document packs built for Aussie sparkies — electrical SWMS, WHS policy, risk register, SOPs. Branded with your logo and licence numbers.
Starter in 48 hours, Full Pack in 72.
Fixed price from $299 · No subscriptions · Rejected-by-PC guarantee
The paperwork's doing your head in.
Every sparky running commercial work knows this rhythm. PC emails, electrical SWMS needed yesterday, nothing you've got fits. Here's what you're probably dealing with.
PC wants the SWMS Friday 4pm
Commercial site won't induct without it. You've got a quote to send and a job to wire — not a weekend of paperwork.
Generic templates that don't know what isolation is
Downloaded a 'general construction' SWMS, filled in your name. Safety officer wants electrical-specific controls.
AI SWMS that misses the high-risk work
Paid $47 for unlimited AI SWMS. Output reads like a uni assignment. Doesn't mention lockout/tagout once.
Quoted $1,200+ and a two-week wait
Consultant wants $1,200-plus and a fortnight. You've got 72 hours and rent to pay.
A full kit of electrician paperwork.
Every document a small Aussie electrical business needs to pass commercial site induction, win tenders, and pass audits — built against Schedule 3 of the Model WHS Regs and tuned to electrical work.
Electrical SWMS
Site-specific Safe Work Method Statement covering your install activities. Hazards, controls, PPE, isolation, sign-off. Tuned to electrical work, not generic construction.
WHS Policy
Your company WHS policy statement. ABN, director sign-off, electrical-licence numbers, commitment clauses, review cycle. Ready for the shed wall.
Risk Register (electrical)
Electrical-trade hazards with likelihood × consequence scoring. Residual risk after controls. Editable, formatted for audit.
Safe Operating Procedures
SOPs for ladders, EWPs, drills, grinders, ceiling-space access — laminate-ready PDFs for the toolbox.
Toolbox Talk Pack
Twelve months of weekly toolbox talks, pre-written and numbered. Crew signs them off. Auditors love 'em.
Worker Induction Form
Onboarding checklist for new sparkies and apprentices. Electrical licences, white card, EWP ticket, PPE sizing, WHS acknowledgement.
Here's what an electrician SWMS looks like.
Every pack is scoped to your business and your activities. The numbers below are illustrative — yours will reflect what's actually on your jobs.
Example only · Hazard and control counts vary by trade scope and activity.
Why GetSorted.
No subscriptions, no AI slop, no consultant hourly rates. Three things you actually get.
Fixed price
$299 to $499 for the standard packs. The price you see is what you pay — no setup fee, no monthly anything, no 'revision pack' upsell.
Human-reviewed
Every pack is read, edited and signed off by someone who understands the Model WHS Regs. AI speeds up the boring parts; humans own the output.
Editable forever
You get the Word and Excel files, not just locked PDFs. Update them whenever you change crews, add activities, or hit reg changes.
What we cover for sparkies.
Not every electrical job needs the same paperwork. Use this table to see which documents support each type of electrical work. Items marked with * will require a quick scope check by phone so we can match the docs to your job properly.
| Work area | Electrical SWMS | SOP | Risk register entry |
|---|---|---|---|
| Residential electrical work | ✓ | ✓ | ✓ |
| Commercial fit-outs | ✓ | ✓ | ✓ |
| Maintenance & repairs | ✓ | ✓ | ✓ |
| Work at heights (ladder / EWP) | ✓ | ✓ | ✓ |
| Plant & equipment use | ✓ | ✓ | ✓ |
| Switchboard upgrades* | ✓ | ✓ | ✓ |
| Data & communications* | ✓ | ✓ | ✓ |
| Testing & commissioning* | ✓ | ✓ | ✓ |
Coverage based on the standard Electrician pack scope. *Switchboard upgrades covered at sub-board level; *data & communications covered at low-voltage scope; *testing & commissioning covered at standard scope. Specialised or higher-voltage variants require custom scoping — contact us before ordering for non-standard work. Solar and battery work scoped separately.
Fixed prices.
No bloody subscriptions.
Pay once, own the docs forever. Same packs whether you're wiring a unit or a tower — the only thing that changes is the scope.
- One site-specific electrical SWMS
- Your ABN + electrical licence populated
- Your logo + brand colours
- 48-hour turnaround
- One revision round
- Editable Word + signed PDF
- Everything in Starter plus:
- WHS Policy document
- Risk Register (Excel)
- 3 × Safe Operating Procedures
- Worker Induction Form
- Three revision rounds
- Everything in Full Pack plus:
- Multiple electrical SWMS (per activity)
- 12-month Toolbox Talk Pack
- Subcontractor Management Plan
- Emergency Response Procedure
- 90-min consult call
- Unlimited revisions
The price you see is what you pay. No setup fee, no "revision pack" upsell, no monthly anything.
If your principal contractor rejects the pack, we rewrite it free until it's accepted. In scope.
Editable Word + Excel files delivered to you. Not locked behind a login. Edit them any time.
What you actually get.
$299–$499 for standard packs. No subscription, no upsell, no monthly anything.
Word and Excel delivered to you. Not locked behind a portal. Edit any time.
Every pack is read and signed off by a person who understands the Model WHS Regs.
If your PC rejects the pack, we rewrite it free until it's accepted, within original scope.
Built in Brisbane (ABN 39 682 505 595). Sorting tradies in NSW, VIC, QLD, WA, SA, TAS, ACT, NT.
Sparky questions we get a lot.
Do electricians need a SWMS?
Yes, for high-risk construction work (HRCW) under Schedule 3 of the Model WHS Regs — and most commercial PCs require one for any electrical work on their site regardless. HRCW includes work at heights ≥ 2 m, energised electrical work, work near energised parts, demolition, and confined spaces.
Can you build SWMS for electrical isolation, testing and high-risk work?
Yes. Our standard electrician pack covers isolation, lockout/tagout, testing and commissioning, work at heights, EWP work, and switchboard work. Energised/live electrical work beyond standard isolation may need separate scoping and additional review — contact us before ordering for live-work-heavy scopes.
Do you cover residential and commercial electrical jobs?
Both. Same pack format, electrician-specific controls. Commercial PC paperwork demands tend to be heavier — your SWMS will be tuned to commercial site requirements where ordered for commercial scope.
Will the documents include my ABN, electrical licence number and logo?
Yes. ABN, electrical licence number, company name and logo populated through every doc. Director sign-off line included.
What happens if the principal contractor rejects the SWMS?
We rewrite it for free until it's accepted, as long as the changes sit within the original scope. Built against Schedule 3 — the same thing PCs audit against — so rejections are rare.
Can I edit the documents after delivery?
Yes. Word and Excel files. Not locked PDFs, not a walled-garden portal. Update when you change crews, add activities, or hit reg changes.
Do you provide Word and PDF versions?
Yes — both. Word/Excel for editing, signed PDFs for sending to PCs.
How is this different from the $47/month AI SWMS tools?
A human writes and reviews every pack. AI speeds up the boring parts (first-draft hazard lists, formatting); humans own the output. That's exactly why the unlimited-AI tools keep getting rejected — no human in the loop.
Still writing electrical SWMS at 10pm? Nah.
Order an electrician pack today. Docs in your inbox within 48–72 hours. Back on the tools where you belong — not wrestling with isolation paperwork all evening.